By Collette E M Lawrence, on 24 April 2019

Building Team blog – Summer Projects 2019

If you have any queries regarding projects please contact Jay james.woodhouse@ucl.ac.uk

The Library has secured funding for four projects from the Central Estates Strategy Board (CESB) for this summer. These are:

Science Library – To create a new accessible toilet to be installed on the ground floor. This will include with a hoist and changing facilities. To be undertaken as soon as possible at the start of the summer, the project is likely to take fourteen weeks.

Graduate Hub, South Wing – Refurbish the main room and kitchenette. This area will become more study focused with individual study spaces, rather than sofas. The Kitchenette and Main room will be redecorated, new floor covering and all new furniture. In the computer room the chairs will be replaced. The duration of this project will be ten weeks.

Senate House Hub – This will repurpose the Senate House hub into a Post Graduate Research (PGR) only space. The front half of the space will be for PGR, while the rear area will be for funded Centre for Doctorial Training (CDT). Some of the existing furniture will be relocated within the space, with some new furniture and an additional card controlled door. The duration of this project will be ten weeks.

Institute of Education – The entrance will be refurbished with new turnstiles and a combined Library/ISD service desk, similar to the Science Library Learning Lab Help point installed last year. Smart Shelves will be installed, this is an alternative to an auto sorter. The duration of the project six weeks towards the end of the summer.